Conctruction progress part 2
The wall between the new mudroom / rear entry and Emi's new bedroom, before and after insulation. I itched for two days after instaling this stuff.
The kitchen with most of the new wiring and insulation done. In the left you see the new peninsula and bar. Cabinets and the range will be located on the back. We were able to salvage enough of the tongue and groove siding from the demo to finish out this short wall.
The kitchen with most of the new wiring and insulation done. In the left you see the new peninsula and bar. Cabinets and the range will be located on the back. We were able to salvage enough of the tongue and groove siding from the demo to finish out this short wall.